福彩快3下载

Once Through Steam Boiler

Once Through Steam Boiler

Sitong once through steam boiler is vertical type with high thermal efficiency (96%) and quick steam generation (3~5 minutes). This series boiler is constructed with vertical water tubes, small steam capacity (0.1-2tph), low infrastructure investment and running quiet. The once through boiler is equipped with full automatic control on temperature, pressure, and water level, etc, to ensure highest safety and reliability.

  • Capacity :0.1-2t/h
  • Pressure :Atmospheric pressure
  • Fuel :Heavy oil, diesel, natural gas, LPG, etc.
  • Application : Heating, molding, drying, hotel, swimming pool, etc.
  • Brief Intro :Once through steam boiler is vertical type boiler with small steam capacity, the efficiency is about 96%, it could generate steam within 3~5 minutes.

    Once Through Steam Boiler

    once through steam boiler

福彩快3下载this boiler is designed by taiwan zuhow company, and produced jointly with sitong boiler, the manufacturing technique has reached the world advanced level. this type boiler is about 20% energy saving than the ordinary boiler. the once through boiler is delivered as a whole when leaving factory, it could operate just need to plug into electric power, there is no need any installation, save installation cost.

Once Through Steam Boiler Application

the once through steam boiler has the advantages of high thermal efficiency, quick steam generation, small area occupied, and energy saving, it could be used for heating, molding, and drying during industrial production, where need small steam capacity. moreover, it could used for restaurant, swimming pool, hotel, school, etc.

Performance Advantages

  1. Quick Steam Generation

福彩快3下载equipped with advanced once-through structure, and the small water capacity achieves fast heat absorption, high thermal efficiency and the steam could be generated within 3~5 minutes.

  1. High Efficiency

1) equipped with specific burner, high automation and combustion efficiency, low nox emission.

2) increases the layout of horizontal fins and vertical fins based on the boiler capacity, combustion gas flows among the water tube bundle at a high speed, excellent heat convection and fast heat transfer efficiency.

福彩快3下载3) by equipping with economizer, make full use of the heat of flue gas, decrease the exhaust smoke temperature, the thermal efficiency increase to as high as 96%.

  1. Full Automatic Control

1) the burner is full automatic, stable operation.

2) full automatic interlock protection program, has the protection function of water shortage, over pressure, over temperature, gas leakage, flame out, electric leakage, and phrase-lacking or overloading of motor, etc.

  1. High Safety Performance

1) complete gas manifolds and protection system, including filter, pressure regulating valve, and solenoid valve, etc., to ensure the safety performance of fuel.

福彩快3下载2) reliable boiler auxiliaries and multiple safety protection devices, such as pressure controller, pressure transmitter, water level alarm, safety valve, etc.

  1. High Quality

1)  all the materials has quality certificate, uses full automatic co2 welding, ndt test and hydraulic pressure will be done for all boilers to ensure the quality.

2) the preheater uses seamless steel pipes, which are treated by sand blasting and hot-dip galvanizing, lengthen the working life.

  1. Centralized Control

福彩快3下载several boilers could be used in parallel, and controlled centrally. moreover, the centralized controller could record the downtime, location, evaporation capacity, fuel consumption, water volume, steam pressure, water tube temperature, exhaust smoke temperature, etc.

Parameter

Model Heat Output

(Kcal/h)

福彩快3下载Working Pressure

(Kgf/cm2)

福彩快3下载Boiler Efficiency

(%)

福彩快3下载Overall Dimension

L×W×H(mm)

Weight

(Kg)

Fuel Consumption
13A  (Nm3/h) LPG Propane (Kg/h) LPG Butane (Kg/h)
ZH-200G 108000 10 88 1154×788×1615 470 12.4 10.7 11.3
ZH-300G/GE 162000 10 88/92 1279/1447×915×1804 620/720 18 15.5 16.5
ZH-500GE/GE1 269000 10 88/92/94 1612/1612×1098×2115 1060/1060 30 26 27
ZH-600GE/GE1 323000 10 88/92/94 1612/1612×1098×2115 1100/1100 36 31 33
ZH-1000GE1/GE2 539000 10 88/92/94/96 1750/1809×1456×2222 1600/1690 85~90 73~78 77~82
ZH-2000GE1/GE2 1080000 10 88/92/94/96 1830/1855×1908×2307 1980/2000 113~121 98~105 103~110
Notes: 1. Parameter is for reference only. 2. The Lower heat valve: 13A=9900kcal/Nm3, LPG Propane=11460kcal/kg, LPG Butane=10900kcal/kg

Save

Save

Save

About the author

steamboilermanufacturer administrator

山东11选五5开奖走势图 七星彩最近300期 猎鱼达人3d卖号 赢了中福在线几十万不给提现 河北快三开奖结果